Accrington Railways - Robert Kenyon

Based on the design of the Iron Duke class, these were the last locomotives built by Walkers of Bury. They were a mixed bag whose domes all occupied different positions, # 55 Rossendale had a dome on the firebox, whilst the others had them in various positions on the boiler. This gives rise to the theory that the boilers were all sourced from different suppliers. The ‘ Ulysses’ Class, built by Stothert & Slaughter, Bristol. No . Name. Type. Date new. Rebuilding date. Date withdrawn. 59 Ulysses 0 - 6 - 0 July 1856 June 1868 June 1876 60 Sphinx 0 - 6 - 0 July 1856 October 1874 August 1882 61 Nestor 0 - 6 - 0 August 1856 un-rebuilt August 1881 62 Memnon 0 - 6 - 0 August 1856 un-rebuilt May 1877 63 Sestostris 0 - 6 - 0 August 1856 un-rebuilt February 1880 The ‘ Giraffe’ Class, built by Beyer Peacock, Manchester. No . Name. Type. Date new. Rebuilding date. Date withdrawn. 65 Giraffe 2 - 4 - 0 July 1857 during 1869 November 1878 66 Antelope 2 - 4 - 0 July 1857 during 1869 August 1879 Part of a cancelled order of five for the London & South Western Railway, they were built to that company’s specifications. They were relatively expensive locomotives at £5,100 each. During 1866 they were exchanged for a pair of Lancashire & Yorkshire Railway engines built by Hawksworth to the same wheel arrangement, numbered 85 and 86. They were rebuilt with new Yates boilers at L & Y’s Miles Platting Works. The ‘ Charon’ Class, built by the Lancashire & Yorkshire Railway, Miles Platting, Manchester. No . Name. Type. Date new. Rebuilding date. Date withdrawn. 64 Charon 0 - 6 - 0 July 1857 July 1871 July 1881 67 Macedo n 0 - 6 - 0 May 1859 December 1874 July 1881 Built before the amalgamation of the Lancashire & Yorkshire Railway with the East Lancashire Railway these were transferred to the ELR. After the take-over a further 28 engines of this class were built by L & YR at their Miles Platting Works specifically for use on the East Lancashire Division. They were not a part of the East Lancashire Railways stock.

The ‘ Craven’ Class, built by the East Lancashire Railway Works, Bury. No. Name. Type. Date new. Rebuilding date.

Date withdrawn. November 1882 November 1892 August 1882

73 Blacklock

2 - 4 - 0 2 - 4 - 0

March 1862 August 1863

March 1862 August 1863

80

Craven Odin**

1

2 - 4 - 0 tank

January 1867 January 1867 October 1871 January

January 1867 as a tender loco

3

Clio**

2 - 4 - 0 tank

January 1867 as a tender loco

August 1882

18

Titan** Juno†

2 - 4 - 0 tank August 1867 September 1867 as a tender loco November 1882

113

2 - 4 - 0

August 1871

February 1886

16

Pegasus

2 - 4 - 0

January 1872

February 1886

10

Made with FlippingBook. PDF to flipbook with ease